Continuous integration builds have changed state:
Travis build 5241. State: passed. Details: https://travis-ci.org/widelands/widelands/builds/549898990. Appveyor build 5020. State: success. Details: https://ci.appveyor.com/project/widelands-dev/widelands/build/_widelands_dev_widelands_get_rid_of_transport_draw-5020.
« Back to merge proposal
Continuous integration builds have changed state:
Travis build 5241. State: passed. Details: https:/ /travis- ci.org/ widelands/ widelands/ builds/ 549898990. /ci.appveyor. com/project/ widelands- dev/widelands/ build/_ widelands_ dev_widelands_ get_rid_ of_transport_ draw-5020.
Appveyor build 5020. State: success. Details: https:/