GTG

Changing due date doesn't update "days left" information

Bug #1047753 reported by Francesco Turco
14
This bug affects 2 people
Affects Status Importance Assigned to Milestone
GTG
Fix Released
High
Codee

Bug Description

I'm using GTG 0.2.9 on an Arch Linux system.

In task editor, when you change the due date without using the internal calendar (i.e. by entering the date manually), the informations on the right side (for example "Due tomorrow!") is not updated. Those informations are instead correctly updated when using the internal calendar.

Tags: date love

Related branches

Nimit Shah (nimit-svnit)
Changed in gtg:
status: New → Confirmed
importance: Undecided → High
summary: - Changing due date doesn't update right side informations
+ Changing due date doesn't update "days left" information
Revision history for this message
Izidor Matušov (izidor) wrote :

Thank you for reporting this bug. I think we don't manage to repair it until the release GTG 0.3, postponing to milestone GTG 0.3.1

tags: added: date
Changed in gtg:
milestone: none → 0.3.1
tags: added: love
Izidor Matušov (izidor)
Changed in gtg:
milestone: 0.3.1 → 0.4
Nimit Shah (nimit-svnit)
Changed in gtg:
assignee: nobody → Codee (kmhpfoss)
Izidor Matušov (izidor)
Changed in gtg:
status: Confirmed → Fix Committed
milestone: 0.4 → 0.3.1
Nimit Shah (nimit-svnit)
Changed in gtg:
status: Fix Committed → Fix Released
To post a comment you must log in.
This report contains Public information  
Everyone can see this information.

Other bug subscribers

Remote bug watches

Bug watches keep track of this bug in other bug trackers.