Hi, this might interfere with AI and the way how it calculates production statistics. Of course this does not mean I am against it. I dont understand the logic of the changes, but a question: when the production is skipped, will the time of this step change? Very roughly if production is successful or failed - both operations last like 30 seconds, but skipping lasts only 2 seconds. I introduced own statistics (very simple and not much accurate) but the one that considers this skipped time. Or will official statistics (as shown on buildings) reflects also this "skipped" time? Tibor 2014-07-02 21:42 GMT+02:00 wl-zocker