lp:~renatofilho/sync-monitor/calendar-start-date

Created by Renato Araujo Oliveira Filho and last modified
Get this branch:
bzr branch lp:~renatofilho/sync-monitor/calendar-start-date
Only Renato Araujo Oliveira Filho can upload to this branch. If you are Renato Araujo Oliveira Filho please log in for upload directions.

Branch merges

Related bugs

Related blueprints

Branch information

Owner:
Renato Araujo Oliveira Filho
Project:
sync-monitor
Status:
Development

Recent revisions

43. By Renato Araujo Oliveira Filho

Use slow sync if some unknow error happen.

42. By Renato Araujo Oliveira Filho

Used "syncInterval" instead of "startDate" for calendar sync filter.

Use 90 days as interval.

41. By Renato Araujo Oliveira Filho

Use the new "startDate" filter to limit the number of events retrieved on the first calendar sync.

40. By PS Jenkins bot

Releasing 0.1+15.04.20141106.1~rtm-0ubuntu1

39. By Renato Araujo Oliveira Filho

Do not start sync monitor with upstart.
The sync monitor will be started by the dbus service only when requested by apps. Fixes: 1384707
Approved by: PS Jenkins bot

38. By Renato Araujo Oliveira Filho

Check for network connection before sync.
Append sync request to run later if no network. Fixes: 1380094, 1384707
Approved by: PS Jenkins bot

37. By PS Jenkins bot

Releasing 0.1+14.10.20140929.1-0ubuntu1

36. By Renato Araujo Oliveira Filho

Do no install calendar online account application file.

This will be installed by the calendar app. Fixes: 1373566
Approved by: PS Jenkins bot

35. By PS Jenkins bot

Releasing 0.1+14.10.20140905-0ubuntu1

34. By Sebastien Bacher

Tweak translation setup so the template is correctly generated Fixes: 1350534
Approved by: Ken VanDine

Branch metadata

Branch format:
Branch format 7
Repository format:
Bazaar repository format 2a (needs bzr 1.16 or later)
Stacked on:
lp:sync-monitor
This branch contains Public information 
Everyone can see this information.