lp:~gtg-contributors/gtg/google_calendar
Created by
Izidor Matušov
on
2011-10-22
and last modified on
2011-11-28
- Get this branch:
- bzr branch lp:~gtg-contributors/gtg/google_calendar
Members of
Gtg contributors
can upload to this branch. Log in for directions.
Branch merges
Branch information
Recent revisions
- 1016. By Izidor Matušov on 2011-10-22
-
Separate repository for Google Calendar which was originally coded by Madhu
- 1015. By Izidor Matušov on 2011-10-08
-
Solved problem with unicode and tag completition: there are more than one representation for unicode
- 1014. By Izidor Matušov on 2011-10-08
-
Extract tags from text instead of having an explicit parameter for first run tasks
- 1011. By Izidor Matušov on 2011-09-30
-
Prevent scheduling loop in task reaper. Solves LP#863211, regression from LP#566278
Branch metadata
- Branch format:
- Branch format 7
- Repository format:
- Bazaar repository format 2a (needs bzr 1.16 or later)
- Stacked on:
- lp:~gtg/gtg/old-trunk