lp:~camptocamp/hr-timesheet/add-test-for-task-project-indicators-jge

Created by Joël Grand-Guillaume @ camptocamp and last modified
Get this branch:
bzr branch lp:~camptocamp/hr-timesheet/add-test-for-task-project-indicators-jge
Members of Camptocamp can upload to this branch. Log in for directions.

Branch merges

Related bugs

Related blueprints

Branch information

Owner:
Camptocamp
Project:
HR - Timesheet Management
Status:
Merged

Recent revisions

73. By Guewen Baconnier @ Camptocamp

[FIX] alignment

72. By Guewen Baconnier @ Camptocamp

[FIX] no mutable in args

71. By Guewen Baconnier @ Camptocamp

[IMP] description in manifest, some typos and layout

70. By Nicolas Bessi - Camptocamp

[FIX] comment english

69. By Nicolas Bessi - Camptocamp

[REVERT] wrongly merged revisions

68. By Nicolas Bessi - Camptocamp

[FIX] unlink in test due to bug in main hr_timesheet addons that does not support unlink with one id

67. By Nicolas Bessi - Camptocamp

[FIX] whitespaces in test

66. By Nicolas Bessi - Camptocamp

[FIX] indicator propagation at project level + incorrect computation of remianing hour when
setting a task on a line without one task

65. By Joël Grand-Guillaume @ camptocamp

[IMP] Simplify the test to try to solve manual testing issue. Reproducing manually the test case fail in the interface for assert planned_time_on_project_01. Seems related to bug : https://bugs.launchpad.net/openobject-addons/+bug/1226648

64. By Joël Grand-Guillaume @ camptocamp

[TYPO] Change the title of the module

Branch metadata

Branch format:
Branch format 7
Repository format:
Bazaar repository format 2a (needs bzr 1.16 or later)
Stacked on:
lp:~hr-core-editors/hr-timesheet/6.1
This branch contains Public information 
Everyone can see this information.

Subscribers