GTG

Due date is not preselected when start date is filled

Bug #1036955 reported by Izidor Matušov
12
This bug affects 2 people
Affects Status Importance Assigned to Milestone
GTG
Fix Released
Critical
Bertrand Rousseau

Bug Description

Steps to reproduce:
1) Set startdate, e.g. 2012-12-24 (either by calendar or writing down the start date in the text input)
2) Open calendar for due date

Expected result: start date is preselected in the calendar

Actual result: the current date is preselected

This is a regression from bug #797359

Related branches

Izidor Matušov (izidor)
tags: added: regression
Izidor Matušov (izidor)
Changed in gtg:
importance: High → Critical
Changed in gtg:
status: Confirmed → Fix Committed
Izidor Matušov (izidor)
Changed in gtg:
assignee: nobody → Bertrand Rousseau (bertrand-rousseau)
Changed in gtg:
status: Fix Committed → Fix Released
To post a comment you must log in.
This report contains Public information  
Everyone can see this information.

Other bug subscribers

Remote bug watches

Bug watches keep track of this bug in other bug trackers.